ROADMAP

What is being built, and what has no date

Every gap named elsewhere on this site is listed here with a real status. Where there is no date it says so, because a date we miss costs more than a blank.

Three states only. In progress means someone is working on it now. Next means it is committed and unstarted. No date means it is real, it is wanted, and nobody can honestly say when.

English teacher console

In progress

The teacher dashboard, the assignment builder, the live classroom, the parent view and the student assignment screens are being translated out of hardcoded Korean into the same i18n system the student app already uses. Roughly half the strings have moved. No completion date is committed.

Curriculum tree beyond the US system in the assignment builder

Next

The standards and the items exist for IB and Cambridge; the builder is pinned to the US tree and cannot walk them. This is a bounded change and it is the single thing blocking an IB or Cambridge department from running a real pilot.

AP Calculus AB and BC exam simulation

No date

Built, not released. It appears in the product with availability off. It is not counted as a feature anywhere on this site and will not be until it ships.

Class and section entity

No date

A student belongs to one teacher. There is no class object, so there is no department view above it and no way to move a cohort between teachers.

Roster import and single sign-on

No date

Clever, ClassLink, OneRoster and LTI are the standard routes and none is built. Google sign-in works today; nothing above it does.

Efficacy evidence

No date

There is no study. The first one would have to come out of a pilot, which is part of why the pilot is free.

If something here is the thing that decides it for you

Tell us which one. A department saying “this is the blocker” moves an item up the list faster than anything else does, and if it cannot move we would rather say that than let you wait for it. marketing@mathiter.com.

Run a class free →
Start Free Diagnostic